Unlocking value and reducing waste through lean transformation

A major car manufacturer was taking 147 -400 days to file a patent application with US govt. This led to them losing out on opportunities where they could have a competitive advantage using that patent. Connecte found them a Lean expert within 7 days to drive lean transformation within their patent filing group. Over the next 60 days, they performed 3 Kaizens which led to the patent filing TAT going down to...

Download Our Case Study.

connecte

© 2024 Connecte

Please fill the form to download the case study.

connecte